FAMILY OWNED AND OPERATED SINCE 1951
HIG_Dryer_Silo
HI-G Dewatering Machine
Desilters
Rubber Lined Manifold
Fines Recovery System
FinesRecoverySystem
Fines Recovery System

FINES RECOVERY SYSTEM

The Derrick Fines Recovery System consists of a cluster of 4″ hydrocyclones mounted over a HI-G® Dewatering Machine, high G performance linear motion screening unit. These products are well suited for all applications where performance and dependability are required.

The Derrick HI-G Fines Recovery System provides unparalleled performance and unmatched cost-effectiveness in handling by-product fines.

  • Hydrocyclones
  • Super G®  Integrated Vibratory Motors
  • Polyweb® Urethane Screens

FEATURES & BENEFITS

  • Up to forty 4” hydrocyclones

  • Designed to remove silt-sized solids (20-74 microns)

  • Optional individual shutoff valve for each 4″ hydrocyclone

  • Zero maintenance

  • Powerful, quiet, dual vibratory motors provide continuous high G-force linear motion

  • Standard Super G has greased-for-life bearings (Two-year warranty)

  • High open area for maximum flow capacity

  • Unique non-blinding design for optimum efficiency and performance

  • Long lasting – 10 to 15 times longer than woven wire panels

RELATED DOCUMENTS

Please note: Information on this website is subject to change. To obtain accurate dimensions and equipment configurations, please contact the Derrick Engineering Department for an updated GA drawing.

G_Dewatering_BrochureCover

HI-G Dewatering Machine

Fill out the form below to Download Brochure:

HI-G Dewatering Machine Brochure Download Form (Location Dropdown)
Sending

Please note: Information on this website is subject to change. To obtain accurate dimensions and equipment configurations, please contact the Derrick Engineering Department for an updated GA drawing.

CS206_CS_Cover

Case Study 206 – Derrick Dewatering Technology Increases Product Quality for Aggregate Producers

Fill out the form below to Download Case Study:

Case Study 206 Download Form (Location Dropdown)
Sending

CS215_CS_Cover

Case Study 215 – Derrick sand production and fines recovery systems provide high quality sand products and reduce need for vast settling ponds

Fill out the form below to Download Case Study:

Case Study 215 Download Form (Location Dropdown)
Sending

CS224_CS_Cover

Case Study 224 – Pond Management Equipment Improves Fines Recovery, Reduces Cost at Aggregate Plant

Fill out the form below to Download Case Study:

Case Study 224 Download Form (Location Dropdown)
Sending

RELATED EQUIPMENT