Efficiency That Pays in Gold.

Derrick Dual Pool 800 Series for Gold Processing

The Dual Pool® 800 is a compact, highefficiency screening solution engineered specifically for gold mining applications where throughput, space constraints and reliability are critical. By combining high openarea panels with a small footprint, it delivers more capacity without requiring additional infrastructure, delivering reliable power in challenging environments.

The Smart Way to Scale Gold Production

The Dual Pool® 800 Series’ advanced design delivers higher throughput and lower cost of ownership—without requiring new infrastructure. This dependable screening solution supports both your productivity and longterm sustainability goals.

Proven Reliability
and Measurable Gains

  • Built for extreme heat, abrasion, chemical exposure, and high solids loading
  • Up to 30% more throughputthan previous Derrick models     
  • Lower total cost of ownership through reduced infrastructure
    and maintenance requirements

Higher Capacity in
a Smaller Footprint

  • High open-area panels with advanced 3D geometry
  • Comparable performance to larger screens in a compact form
  • Fits directly into legacy Derrick screen locations 

Faster, Safer Maintenance
with Lower Demand

  • Rapid panel replacement minimizes downtime
  • Reduced power and water usage—ideal for remote or generator-powered sites
  • Smaller structural footprint lowers installation and steel requirements

See the Dual Pool 800 in Action

Ready to unlock higher throughput in the same footprint?
Talk to a gold applications specialist today.