TheDualPool®800is a compact,high–efficiencyscreening solution engineered specifically for gold mining applications where throughput, spaceconstraintsandreliabilityarecritical.Bycombininghigh open–areapanelswithasmallfootprint,itdeliversmorecapacity without requiring additional infrastructure, delivering reliable power in challenging environments.
The Smart Way to Scale Gold Production
The Dual Pool® 800Series’advanced design delivers higher throughput and lower cost of ownership—without requiring new infrastructure. This dependable screening solution supports both your productivity and long–term sustainability goals.
Proven Reliability and Measurable Gains
Built for extreme heat, abrasion, chemical exposure, and high solids loading
Up to 30% more throughputthan previous Derrick models
Lower total cost of ownership through reduced infrastructure and maintenance requirements
Higher Capacity in a Smaller Footprint
High open-area panels with advanced 3D geometry
Comparable performance to larger screens in a compact form
Fits directly into legacy Derrick screen locations
Faster, Safer Maintenance with Lower Demand
Rapid panel replacement minimizes downtime
Reduced power and water usage—ideal for remote or generator-powered sites
Smaller structural footprint lowers installation and steel requirements
See the Dual Pool 800 in Action
Ready to unlock higher throughput in the same footprint? Talk to a gold applications specialist today.