Field Report 179

Hyperpool® GT Saves Major Operator Over $360,000 in Whole Mud Dilution Cost FIELD REPORT 179 Delivering Higher Efficiency & Lower Costs in the Colorado DJ Basin 13% Solids Removal Efficiency […]

Field Report 180

Hyperpool® GT Saves Major Operator Over $65K per Well FIELD REPORT 180 Delivering Higher Capacity & Lower Drilling Costs in the New Mexico Delaware Basin 72% Reduction in Dilution Ratio […]

Case Study 248

Kropz South Africa CASE STUDY 248 Emerging Phosphates rock producer saves millions on infastructure costs with high-capacity Derrick Superstack Simplified Flowsheet Increased Grade Classification of Phosphates Lower Carbon Emissions Millions […]