Key Installation Benefits
Informed – Data driven analysis from 194 wells drilled by 9 rigs over a 10-month period.
Efficiency – Rigs with Derrick Dual Pool® 626 shakers required 34% less base oil addition.
Durability – Rigs with Derrick Dual Pool® 626 shakers used 36% fewer screens per 1500m drilled.